REQUIRED TOOLS
- Hose cutter
REQUIRED PARTS
- Jack - Installation kit (Ref 12678)
- Water inlet hose 3/8 (1,5m)
- Pressure reducer
- Metal braided
- JG fitting 3/8 pushfit - 3/8M bsp
- 3/8 pushfit shut-off tap
- Blue 3/8 fitting clips (for cold water) (2pcs)
- Drain hose (1,5m)
- Fitting - elbow 8mm pushfit with 8mm side stem (Ref 12241)
- Drain connection (1 zipbag)
- High feet (4pcs)
- Moose hanky (barista towel)
- Moose marker (Ref 11979)
- Tx25 black screw cap (4pcs)
- Water-filtration (Min 3Bar)
BEFORE YOU START
|
PROCEDURE
- Place the Perfect Moose Jack on the counter.
- Check the content of the installation kit.
- Install the water-filtration.
- Check if the pressure is min 3Bar after the water-filtration.
- Connect the water inlet hose to the water-filtration with the JG fitting 3/8 pushfit - 3/8M bsp.
- Cut the water inlet hose with a hose cutter to length and to install the shut-off tap.
- Place the pressure reducer on the water inlet hose.
- Screw the metal braided hose on the pressure reducer. (Do not overtighten!)
- Remove the yellow tap from water inlet on the Perfect Moose Jack and connect the metal braided hose onto the Perfect Moose Jack.
- Place a Y-piece on the wall drain pipe. Install the push-in fitting 1/4M on a drain end-cap and place to drain end-cap on the top of the Y-piece.
- Connect the drain hose to the drain end-cap and lock the drain hose with the red 8mm fitting clips (for hot water).
- Cut the drain hose to length with a hose cutter and connect the drain hose to the drain of the Perfect Moose Jack. Lock the drain hose with the red 8mm fitting clips (for hot water).
- Insert the power cable in the powersocket and switch on the Perfect Moose.
- Follow the first start procedure for finishing the installation of the Perfect Moose Jack
Which water filtration do I need?
Click here to find which water filter system and size of filter system is needed.