REQUIRED TOOLS
- Screwdriver T10 Torx head
- Screwdriver T25 Torx head
- Allen key #5
BEFORE YOU START
|
PROCEDURE
- Move the steam wand up to the top.
Carry the Jack housing with 2 hands and fit the steam wand through the slit of the housing.
Push the housing to the back. Take care that the housing doesn't touch the RFID holder.
Move the housing downwards to fit the RFID holder through the housing.
Push the housing backwards Check the alignment of the touchscreen in the housing! If needed, pull the touchscreen downwards with 2 fingers to align it in the housing of the Moose.
Screw the 4 black T25 Torx screws in the back of the Moose and the 2 Hex #5 socket cap screws on the front of the housing.
WARNING the tightening force of the screw is max 1Nm!Place the pitcher holder base on top of the RFID holder.
Screw the 2 T10 Torx screws in the pitcher holder base.
Put pitcher holder (Greg or Epic Greg) on the pitcher holder base.
Turn the pitcher holder until it is flush with the housing of the Moose.
Carry the Jack housing with 2 hands to fit over the boiler part.
Screw the 4 screws on the side of the Jack housing (back) with a Torx T25 screwdriver
NEED TO OPEN THE MOOSE?
You can find the article to close the Moose housing by clicking here.